Beginning of the Project: Needs Analysis and Discovery
The business in Antalya reported that its existing water source greenhouse irrigation systems for this was insufficient and that the pump pressure dropped during peak hours. In the site survey carried out, the tank location, ground slope, distance to the power line and existing drip irrigation main line connection points were mapped. The modular steel water tank capacity was calculated with the goal of daily irrigation consumption and at least one day of reserve water.
In terms of climate, in Antalya evaporation and irrigation frequency increase in the summer months. For this reason, the tank volume was planned not only for the immediate need but together with seasonal peaks. Together with the customer, modular steel water tank dimensions and panel layout were approved; the concrete details for the foundation platform were forwarded to the technical team.
Installation and Ground Preparation
After the ground was levelled and the foundation concrete completed its curing period, the galvanized panel modules were assembled by the on-site installation team. During the modular steel water tank installation, the panel sequence, gasket placement and connection torque values were applied in accordance with the manufacturer's procedure. During Antalya's hot periods, working hours were shifted to the early morning to maintain installation efficiency.
When the installation was completed, the inner liner and outer steel surface were inspected. The inlet valve, overflow line and pump suction connection were positioned according to the project drawing. At this stage, a provision was left for the level sensor to be connected to the greenhouse irrigation automation; thus future automation integration was made easier.
Commissioning and Irrigation Integration
During the first fill test, the watertightness and panel joints were verified visually and with a pressure test. When the pump was commissioned, the flow rate, pre-filter pressure and drip line end pressures were measured. The previous low-pressure problem was resolved with sufficient tank volume and the correct pump selection. Periodic inspection, cleaning and winter drain-and-fill recommendations were delivered in writing to the facility officials.
At the end of the project, the business was able to manage its irrigation plan more predictably. For greenhouse and agricultural operations with similar needs in the Antalya region, the modular steel water tank offered a reliable solution that is commissioned in a shorter time compared to concrete alternatives.
Project Management with DEAGRO
As DEAGRO, with our Antalya-based team, we carry out the processes of site survey, manufacturing coordination, installation and technical support under one roof. If you too are planning a modular steel water tank at your site, we can evaluate your existing irrigation infrastructure together.
Project support in Antalya and surrounding areas
Schedule a meeting with our field team for reconnaissance and capacity calculation.